To ensure efficient review timelines please include all the following essential items:
One copy of a completed permit application form, including plumbing or mechanical
Two copies of the construction drawings including site and tree retention plans
Three copies of the site plan
Minimum 81/2 inches by 11 inches
Maximum 11 inches by 17 inches
Two copies of the completed, current Washington State Energy Code compliance form
One copy of septic system approval, if applicable, from the Tacoma Pierce County
Water:
One copy of the water availability certificate if the project is located within the Fruitland Mutual Water Company, Valley Water, or City of Tacoma service area
One copy of fire flow calculations (obtainable on a water availability certificate) for new construction or additions to structures that are, or will be, 3600 square feet or larger