Manorwood Water Main Replacement Ph 2 & 3

CIP Project Number: 21-032

Project Manager: Jessica Wilson

Project Description:

This project is a continuation of the water main replacement in the Manorwood subdivision.  Phases 2 and 3 of the project have been made possible with generous funding by the American Rescue Plan Act.

The existing water main in the Manorwood area is 4-inch and 6-inch PVC pipe. The water main was installed in the 1970s and is approaching the end of its useful service life. When this water main was installed, it was not bedded properly, resulting in numerous water main breaks and significant property damage.  Phase 2 includes replacement of approximately 2,000 feet of main with 4-inch and 8-inch water pipe along 32nd Ave SE and 28th St SE. Phase 3 includes replacement of approximately 1,250 feet of main with 8-inch water pipe along 33rd Ave SE and 27th St SE. Additionally, this project will replace fire hydrants, water services, and appurtenances along these alignments. 

The City selected KPG Psomas to design the projects. Construction is anticipated in Spring of 2023. For questions about the project, please contact Jessica Wilson at (253) 435-3645. For questions regarding pressure reducing valves, please contact Craig Hale at (253) 841-5503.

Approved Budget/Est Cost (All Phases): $3,400,000

Construction is anticipated to begin in mid-June 2023 and end by the end of 2023. 

Update as of May 2023:

Construction of the project has been awarded to Pape & Sons Construction, Inc. The contract amount is $1,525,354.55 including taxes.

What you can expect during construction:

  • Typical construction noise from trucks and machinery.
  • Crews will maintain access to driveways whenever possible, in coordination with impacted neighbors.
  • Signs and traffic control flaggers will guide local traffic and pedestrians safely through the work zone.

Thank you for your patience while we complete this important work. For questions during construction, please contact the City inspector Ron Johnson at (253) 290-0914. For questions regarding the project, please contact Jessica Wilson at (253) 435-3645.

Map of Manorwood Phase 2 3